|
|
 |

One of the key barriers to a successful operation is poor design
and capacity planning. HK aim to ensure the right equipment
is positioned in the right place to achieve success. |
| |
| |
•
Site assessment to discuss preferred design logistics
• Technical planning and CAD design •
Liaison with Environment Health (EHO) • Communicating
design • HSE, DDA and risk matters,
• Briefing documents with building services engineers,
documents with architects, documents
with directs, • Ventilation and interlock systems
|
|
| |
| |
| |
| |
| |
 |
|
|